Fabricated Stainless Steel, Halo Lit, 1.5″ Deep, 12″ High, Painted Black, Studs with 1″ standoffs, LEDs, 25′ long Cable leads, text: Sue & Stanley Cox Hall Cox Hall (install patterns)

$5,200.00

Category: